<?xml version="1.0" encoding="utf-8" ?><rss version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom"
     xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
     xmlns:media="http://search.yahoo.com/mrss/">

   <channel>
       <title>Documents - OCIMF</title>
       <description><![CDATA[]]></description>
       <link>https://www.ocimf.org/document-libary/sire-2-0-instructions-for-completing-the-pre-inspection-questionnaire-version-1-0?format=html</link>
              <lastBuildDate>Thu, 28 Apr 2022 13:57:36 +0000</lastBuildDate>
       <atom:link href="https://www.ocimf.org/document-libary/sire-2-0-instructions-for-completing-the-pre-inspection-questionnaire-version-1-0?format=rss" rel="self" type="application/rss+xml"/>
       <language>en-GB</language>
       <sy:updatePeriod>hourly</sy:updatePeriod>
       <sy:updateFrequency>1</sy:updateFrequency>

              <item>
           <title>SIRE 2.0 Instructions for Completing the Pre-Inspection Questionnaire</title>
           <link>https://www.ocimf.org/document-libary/664-sire-2-0-instructions-for-completing-the-pre-inspection-questionnaire-version-1-0?format=html</link>
           <enclosure url="https://www.ocimf.org/document-libary/664-sire-2-0-instructions-for-completing-the-pre-inspection-questionnaire-version-1-0/file" length="1171588" type="application/pdf" />
           <media:content
                url="https://www.ocimf.org/document-libary/664-sire-2-0-instructions-for-completing-the-pre-inspection-questionnaire-version-1-0/file"
                fileSize="1171588"
                type="application/pdf"
                medium="document"
           />
           <media:title type="plain">SIRE 2.0 Instructions for Completing the Pre-Inspection Questionnaire</media:title>
           <media:description type="html"><![CDATA[<p><span>A guide on how to complete a Pre-Inspection Questionnaire (PIQ). In combination with the HVPQ, this will ensure appropriate questions are assigned to each inspection, additional information is given to inspectors during inspections and a more detailed inspection report is produced. </span></p>]]></media:description>
                      <guid isPermaLink="true">https://www.ocimf.org/document-libary/664-sire-2-0-instructions-for-completing-the-pre-inspection-questionnaire-version-1-0?format=html</guid>
           <description><![CDATA[<p><span>A guide on how to complete a Pre-Inspection Questionnaire (PIQ). In combination with the HVPQ, this will ensure appropriate questions are assigned to each inspection, additional information is given to inspectors during inspections and a more detailed inspection report is produced. </span></p>]]></description>
           <author>harriet@thebrandmarquee.co.uk (Hattie Rogers)</author>
           <category>SIRE 2.0</category>
           <pubDate>Thu, 28 Apr 2022 13:57:36 +0000</pubDate>
       </item>
          </channel>
</rss>